Time-based progress through a retrograde period and its longitude shadow.
Exact result of getRetrogradeShadow, in the selected frame.
TT midpoint between stations.
Optional
Midpoint converted to UT, when both station UT fields are supplied.
Linear elapsed station-to-station percentage, clamped to [0, 100].
Time-based progress through a retrograde period and its longitude shadow.